Brandeis University Carl J. Shapiro Science Center

Waltham, MA

Project Details

  • Category: leed
  • Location: Waltham, MA
  • Schedule: On time

Scope of Work

Ambitious two-phase plan combined renovation, new construction and demolition to create ~137,000 sf of new research, teaching and instrumentation space within a 558,000 sq feet building complex. MD&B was involved in blasting rock for the foundation and site improvements of the new structure

Challenges

The project occurred while University classes were in session.

Schedule

All drilling & blasting was accomplished (on-schedule in 3 months).

Summary

All capital projects at Brandeis are designed and built to a LEED-Silver-equivalent or better standard. Building materials included cladding with recycled content, natural linoleum, recycled stone flooring, sustainable solid-surface material, urea-formaldehyde free wood products, low VOC paints, and carpet made with recycled fibers. Sustainability strategies included heat recovery with enthalpy wheel; high-performance glazing and sunshading; a green roof; a daylight harvesting system; and replacement of previously impervious paving with landscaping to reduce stormwater runoff.

Get a free drilling and blasting project quote! We offer free project quotes, just reach out and we will make it happen!

In order to have the correct person contact you for a free on-site evaluation and quote on your rock blasting project, we need some basic information to start. Please use the button below to submit your project details and we will get back to you as soon as possible.

Get Quote Now